How to install pasting type cork floor?
Cork floor belongs to a kind of high-grade decoration materials, with sound-absorbing, heat insulation, moisture-proof, wear-resisting and other excellent characteristics. So much advantage lets it get the welcome of people more and more, more and more family chooses to use cork floor when decorating, the installation of cork floor needs professional personnel to undertake operation, so how should specific cork floor be installed?
①Clean the ground, in order to achieve the ideal installation effect, must want to advance will need to install the ground of the cork floor is clean, not leave traces of granular dust, at the same time to ensure that the flat on the ground, to avoid uneven ground which affects the installation of the floor, in addition to this, best can use to smooth the surface grinding machine, conditional word will best surface flatness error control within 2 mm.
②Roller coating interface agent, paste type cork floor general installation when the use of self-leveling cement paste system, so in order to ensure that cement and the ground between can be tight bond, need to advance in the surface layer of the ground daub a layer of interface agent. The interfacial agent can be applied from the corner, one time to the central area of the rolling coating, until the entire floor. Interfacial agent still has certain moistureproof action, can let cork floor appear in using the phenomenon that prevents to be affected with damp.
③Screeding self-leveling cement, when the interface agent can start mixing self-leveling cement after drying, at this point you can use the professional tools, stir to cement fully stir well, pour in the ground before it has yet to produce precipitation, can from inside to outside by the corner of the room began to fall, then, within 3 mm thickness control, need after screeding self-leveling cement internal air out.
④Ground roll plastic, smoothing of self-leveling cement floor further and aspiration after processing, it can be used in water-based adhesive cork floor paint roller coating on the ground, you need to use manual cloth glue in the corner, the other can be directly to roll on the ground, in addition, the cork floor on the back of the page to besmear to brush a layer of water-based glue, had better choose the same as the ground roll adhesive glue.
⑤Stick a floor, when daub is over glue hind can begin to stick connect cork floor, general shop outfit means to be able to extend from among to cold mix, according to the group that had chosen before undertakes joining together, with the shop of real wood floor is installed different, cork floor does not need to be in installing a process between metope reserved give contractive aperture.
⑥Protect maintain, cork floor still needs to be in floor surface layer to roll besmear a special protection lacquer after be being stuck completely, use the wear resistance that raises cork floor and water proofing property, extend its use time.
Above is all the tips of how to install pasting type cork floor,if you want to know more about cork products,welcome to watch the news about Kukesi Cork Co., Ltd.
Dongguan Kukesi Cork Co.,ltd. is a company that focus on comprehensive cork enterprise with cork sheet, rolled cork fabric/leather, molded cork products, cork wallpaper, cork packing products and cork household products.And there are a lot of novel furniture living wood products, such as cork cup holder, cork stool, cork flowerpot, cork clock and so on.The quality of the products is guaranteed, and the price is very competitive in the industry.and we have perfect customizd service and after-sales service,if have any qustions,please feel free contact us.
Contact Person:Lyfica Zhang
ADD:Jinshi Industrial Park,South District,Zhenhua Road,Dalingshan Town,Dongguan City,Guangdong Province,China
Emial:jim@kukesi-cork.com
TEL:0086-13712266819